McCracken County Fiscal Court

McCracken County Zoning Section 63

 
cd
McCracken County Zoning Section 63

 

Storm Water Conveyance Facilities Design

 

The following criteria shall control when designing storm water conveyance facilities;

1.     Open channels and roadside ditches:        Twenty-five (25) year design storm

2.     Storm sewers and inlets design storm:      Twenty-five (25) year design storm

3.     Entrance pipes and cross drains:              Twenty-five (25) year design storm.  Maximum headwater under 100-year storm shall not be allowed to overtop roads or increase the flooding potential in the affected areas.

 

 

Download printer-friendly PDF Document