McCracken County Fiscal Court
McCracken County Zoning Section 63
| |
|
Storm Water Conveyance Facilities Design
The following criteria shall control when designing
storm water conveyance facilities;
1. Open channels and roadside ditches:
Twenty-five (25) year design storm
2. Storm sewers and inlets design storm:
Twenty-five (25) year design storm
3. Entrance pipes and cross drains:
Twenty-five (25) year design storm. Maximum headwater under 100-year storm
shall not be allowed to overtop roads or increase the flooding potential in the
affected areas.
Download printer-friendly PDF Document
|
|
|
|
|
|
|