|
Storm Water Management Plan
I.
The final storm water management plan shall include, but not be limited to the
following:
A. All
calculation, assumptions and criteria used in the design of the storm water
management facility.
B.
All plans and profiles of proposed storm sewers and open channels including
horizontal and vertical controls, elevations, sizes, slopes, and materials.
C.
Location, dimensions, and design details required for the construction of all
facilities.
D. A
description of the operation and maintenance needs for the storm water
management facility.
E.
All information relative to the design and operation of emergency spillways.
F.
Project specifications relative to erosion and sedimentation control.
(Refer to Best Management Practice for Construction Activities prepared by the
Kentucky Natural Resources and Environmental Protection Cabinet for design
guideline associated with erosion and sediment control.)
G. All
easements, rights-of-way, ownership, and maintenance responsibilities for all
storm water management control structures during and after development.
The identity of the responsible individual, corporation, or association and the
specific maintenance must be outlined on the plan.
Download printer-friendly PDF Document
|